I know a caravan manufacturer ships Aussie steel to China where the chassis is assembled and shipped back to Aussie. They don't trust Chinese steel but the assembly and welding work is fine.
In pumped hydro turbines are also pumps. No pump can draw more than about 6 metres which is an atmospheric head of water after losses. So all the gear has to be at the bottom of the shaft or pit, not at the top.